CASE STUDY · 08
New Basement Blindside Tank — Balwyn
New basement against boundary — no access post-pour. Bentonite pre-applied to shoring, poured wet against membrane, self-sealed on contact.
Sector
Residential
Suburb
Balwyn
Area
260 m²
Duration
12 days
01SCOPE OF WORKS
Delivered items.
- —Blindside bentonite install
- —Waterstop at construction joints
- —Pre-pour QA
- —Post-pour walk