CASE STUDY · 03
Modernist flat roof leaking at parapet flashings and solar mount penetrations. Full strip, new insulation, twin-layer torch-on with prefab pipe boots.
Sector
Residential
Suburb
Brighton
Area
220 m²
Duration
5 days
01SCOPE OF WORKS
Delivered items.
- —Strip failed membrane
- —Insulation replacement
- —2-layer torch-on
- —New flashings